In connection with the demolition of an overpass, plaintiff, an asbestos handler, was instructed to descend from the overpass's partially demolished roadway onto a wooden deck approximately three feet below, where he was to erect a decontamination chamber for the removal of asbestos from a pipe traversing the overpass. Plaintiff was required to step from the roadway, from which rebar was protruding, onto a foot-wide I-beam about nine inches below the roadway and from the...