Plaintiff sues to recover the sum of $151,862.11, the deductions made by defendant for 443,393 cubic yards of alleged excess overdepth and overslope dredging.
Plaintiff had a contract for performing certain dredging work in Cape Cod Canal and in Hog Island Channel in Buzzards Bay, Massachusetts, including the dredging of a channel leading into Onset Bay. Plaintiff was required to dredge the channel leading into Onset Bay to a depth of 17 feet...